How many spare fibres to pull in the feeder

The cheapest fibre you will ever buy is the one already in the ground. The most expensive is the one you have to go back for.

The question comes up on every regional build: the feeder run needs 48 fibres today, so do you buy 48, 96 or 144?

Buy 48 and you have optimised the wrong number. The cable itself is a small share of that section's cost — the duct, the trench, the traffic management and the reinstatement are most of it, and none of them care how many fibres are inside. Going from a 48F to a 144F construction on the same route typically adds a fraction of what a second civils pass would cost, and the second pass is what you are buying insurance against.

What tends to eat the spares

  • Take-up above plan. Pleasant problem, same trench.
  • Business customers off the same route. A single dedicated-fibre contract can absorb more than the residential plan assumed.
  • Backhaul for someone else. Mobile operators and municipal networks will pay for dark fibre on a route that already exists.
  • Breaks and repairs. Every repair splice costs you working fibres at that point.

A working rule

Plan 30–50% above day-one demand on distribution, and on the feeder go to the next standard count above that — 48 becomes 96, 96 becomes 144. Standard counts matter: they match the closures and the splice trays your crews already carry.

The exception is genuinely short runs inside a site you own, where going back is cheap. There, buy what you need.