English
CR Fiber Optics

One-stop fibre supply for regional FTTH operators

Every layer of your FTTH build, from one supplier

Feeder, distribution, aerial, drop and in-building — we make all of it, ship it as one mixed load, and tell you what to specify before you ask for a price. Built for regional ISPs, not only tier-1 carriers.

15M Fibre-km annual capacity
6 Network layers, one supplier
1–288F Fibre count range
CPR Euroclass declared, DoP included

For regional FTTH operators

Which cable goes where

A full FTTH build has six layers and they do not take the same cable. Below is what we supply for each, and what to pin down before you ask for a price.

Applications

The fibre itself

Everything else is packaging. Get the fibre grade right first — it decides your loss budget and how tight a bend the install crew can get away with.

Confirm before ordering

G.652.D for the outside plant; G.657.A1 or A2 anywhere the route gets tight — risers, wall boxes, pre-terminated assemblies.

View details ↗

Applications

Feeder — OLT to the primary splitter

High fibre count, long runs, ducted or direct-buried. This is the section you least want to dig up again, so armour and fibre count both want headroom.

Confirm before ordering

Fibre count including spare (plan 30–50% above day-one demand), duct or direct burial, and whether rodents are a known problem on the route.

View details ↗

Applications

Distribution — splitter to street or building

Mid count, shorter runs, more joints. Handling matters more here than raw strength: your crews will be opening these all day.

Confirm before ordering

Fibre count per branch, duct versus aerial, and the closure type you standardise on — tube count has to match it.

View details ↗

Applications

Aerial spans and shared poles

Where trenching is not worth it. If you are sharing poles with live power lines, the cable has to be all-dielectric — no metal anywhere.

Confirm before ordering

Longest span in metres, whether the poles carry live LV/MV lines, and who owns them. Span length decides the construction, not the fibre count.

View details ↗

Applications

Drop — the last span to the subscriber

The highest volume item in any FTTH build and the one your install crews touch most. Strip time per drop, multiplied by thousands of homes, is real money.

Confirm before ordering

Aerial or underground, span length, 1 / 2 / 4 core, and whether your crews field-connectorise or splice on site.

View details ↗

Applications

In-building — riser and floor distribution

Indoors in the EU this is where the fire regulations bite. Getting the class wrong is not a price difference, it is a failed inspection.

Confirm before ordering

The CPR Euroclass your project specifies (Eca / Dca / Cca / B2ca) — it changes the sheath compound and therefore the lead time. Tell us at enquiry stage.

View details ↗

Applications

Tunnels, shafts and other awkward places

Rail tunnels, mine roadways, plant rooms. Fire performance and mechanical protection together, usually against a specification someone else wrote.

Confirm before ordering

The exact standard the specification cites, plus whether metal is allowed in the construction at all.

View details ↗

Product range

Built to published specifications

Every model ships with a full datasheet. Specifications below are the ones we test against, not marketing figures.

All products →

Standards and compliance

Standards and compliance

ISO 9001:2015 ISO 14001 IEC 60794 ITU-T G.652 / G.657 RoHS REACH CPR Eca

Need a quotation or a technical datasheet?

Tell us the model, quantity and destination port. Most enquiries are answered within one business day.

Request a Quote Email Us