Español
CR Fiber Optics

¿Necesita un presupuesto o una ficha técnica?

Indíquenos modelo, cantidad y puerto de destino. La mayoría de las consultas se responden en un día laborable.

Para operadores FTTH regionales

Qué cable en cada tramo

Un despliegue FTTH completo tiene seis capas y no admiten el mismo cable. Abajo, qué suministramos en cada una y qué conviene cerrar antes de pedir precio.

Aplicaciones

The fibre itself

Everything else is packaging. Get the fibre grade right first — it decides your loss budget and how tight a bend the install crew can get away with.

Confirmar antes de pedir

G.652.D for the outside plant; G.657.A1 or A2 anywhere the route gets tight — risers, wall boxes, pre-terminated assemblies.

Ver ficha ↗

Aplicaciones

Feeder — OLT to the primary splitter

High fibre count, long runs, ducted or direct-buried. This is the section you least want to dig up again, so armour and fibre count both want headroom.

Confirmar antes de pedir

Fibre count including spare (plan 30–50% above day-one demand), duct or direct burial, and whether rodents are a known problem on the route.

Ver ficha ↗

Aplicaciones

Distribution — splitter to street or building

Mid count, shorter runs, more joints. Handling matters more here than raw strength: your crews will be opening these all day.

Confirmar antes de pedir

Fibre count per branch, duct versus aerial, and the closure type you standardise on — tube count has to match it.

Ver ficha ↗

Aplicaciones

Aerial spans and shared poles

Where trenching is not worth it. If you are sharing poles with live power lines, the cable has to be all-dielectric — no metal anywhere.

Confirmar antes de pedir

Longest span in metres, whether the poles carry live LV/MV lines, and who owns them. Span length decides the construction, not the fibre count.

Ver ficha ↗

Aplicaciones

Drop — the last span to the subscriber

The highest volume item in any FTTH build and the one your install crews touch most. Strip time per drop, multiplied by thousands of homes, is real money.

Confirmar antes de pedir

Aerial or underground, span length, 1 / 2 / 4 core, and whether your crews field-connectorise or splice on site.

Ver ficha ↗

Aplicaciones

In-building — riser and floor distribution

Indoors in the EU this is where the fire regulations bite. Getting the class wrong is not a price difference, it is a failed inspection.

Confirmar antes de pedir

The CPR Euroclass your project specifies (Eca / Dca / Cca / B2ca) — it changes the sheath compound and therefore the lead time. Tell us at enquiry stage.

Ver ficha ↗

Aplicaciones

Tunnels, shafts and other awkward places

Rail tunnels, mine roadways, plant rooms. Fire performance and mechanical protection together, usually against a specification someone else wrote.

Confirmar antes de pedir

The exact standard the specification cites, plus whether metal is allowed in the construction at all.

Ver ficha ↗

Gama de producto

Fabricado según especificaciones publicadas

Cada modelo se entrega con su ficha técnica completa. Los valores indicados son valores de ensayo, no cifras de marketing.

Todos los productos →

Normas y conformidad

Normas y conformidad

ISO 9001:2015 ISO 14001 IEC 60794 ITU-T G.652 / G.657 RoHS REACH CPR Eca

¿Necesita un presupuesto o una ficha técnica?

Indíquenos modelo, cantidad y puerto de destino. La mayoría de las consultas se responden en un día laborable.

Solicitar presupuesto Escríbenos