Nederlands
CR Fiber Optics

Voor regionale FTTH-operators

Welke kabel waar

Een volledige FTTH-uitrol kent zes lagen en die vragen niet om dezelfde kabel. Hieronder wat we per laag leveren en wat u vóór de prijsaanvraag vastlegt.

Toepassingen

The fibre itself

Everything else is packaging. Get the fibre grade right first — it decides your loss budget and how tight a bend the install crew can get away with.

Vooraf vastleggen

G.652.D for the outside plant; G.657.A1 or A2 anywhere the route gets tight — risers, wall boxes, pre-terminated assemblies.

Bekijk details ↗

Toepassingen

Feeder — OLT to the primary splitter

High fibre count, long runs, ducted or direct-buried. This is the section you least want to dig up again, so armour and fibre count both want headroom.

Vooraf vastleggen

Fibre count including spare (plan 30–50% above day-one demand), duct or direct burial, and whether rodents are a known problem on the route.

Bekijk details ↗

Toepassingen

Distribution — splitter to street or building

Mid count, shorter runs, more joints. Handling matters more here than raw strength: your crews will be opening these all day.

Vooraf vastleggen

Fibre count per branch, duct versus aerial, and the closure type you standardise on — tube count has to match it.

Bekijk details ↗

Toepassingen

Aerial spans and shared poles

Where trenching is not worth it. If you are sharing poles with live power lines, the cable has to be all-dielectric — no metal anywhere.

Vooraf vastleggen

Longest span in metres, whether the poles carry live LV/MV lines, and who owns them. Span length decides the construction, not the fibre count.

Bekijk details ↗

Toepassingen

Drop — the last span to the subscriber

The highest volume item in any FTTH build and the one your install crews touch most. Strip time per drop, multiplied by thousands of homes, is real money.

Vooraf vastleggen

Aerial or underground, span length, 1 / 2 / 4 core, and whether your crews field-connectorise or splice on site.

Bekijk details ↗

Toepassingen

In-building — riser and floor distribution

Indoors in the EU this is where the fire regulations bite. Getting the class wrong is not a price difference, it is a failed inspection.

Vooraf vastleggen

The CPR Euroclass your project specifies (Eca / Dca / Cca / B2ca) — it changes the sheath compound and therefore the lead time. Tell us at enquiry stage.

Bekijk details ↗

Toepassingen

Tunnels, shafts and other awkward places

Rail tunnels, mine roadways, plant rooms. Fire performance and mechanical protection together, usually against a specification someone else wrote.

Vooraf vastleggen

The exact standard the specification cites, plus whether metal is allowed in the construction at all.

Bekijk details ↗

Productprogramma

Gebouwd volgens gepubliceerde specificaties

Bij elk type hoort een volledig datablad. De genoemde waarden zijn testwaarden, geen marketingcijfers.

Alle producten →

Normen en conformiteit

Normen en conformiteit

ISO 9001:2015 ISO 14001 IEC 60794 ITU-T G.652 / G.657 RoHS REACH CPR Eca

Offerte of technisch datablad nodig?

Geef type, aantal en bestemmingshaven door. De meeste aanvragen beantwoorden we binnen één werkdag.

Offerte aanvragen Mail ons