Italiano
C CR Fiber Optics

Per operatori FTTH regionali

FTTH solutions for regional operators

Six network layers, one supplier, one shipment — and a straight answer on what to specify.

Most cable suppliers will sell you a drum of whatever you name. That works if you already know exactly what to name. If you are a regional operator putting fibre past a few thousand homes a year, the harder part is usually the specifying, not the buying.

So we do it the other way round. Send us the build — how many homes, aerial or ducted, how many premises per branch, what the tender says about fire class — and we come back with a bill of materials layer by layer, with the reasoning attached. If something in your specification will cause trouble on site, we would rather say so before the order than after.

One order, one shipment

A full FTTH build touches six different cable constructions. Sourcing them from six suppliers means six MOQs, six lead times, six sets of test certificates and six chances for one late item to hold up a crew. We make all six, so it goes out as one mixed load with one set of paperwork.

Per operatori FTTH regionali

Quale cavo per quale tratta

Un impianto FTTH completo ha sei livelli e non vogliono lo stesso cavo. Qui sotto cosa forniamo per ciascuno e cosa definire prima di chiedere un prezzo.

02

Feeder — OLT to the primary splitter

High fibre count, long runs, ducted or direct-buried. This is the section you least want to dig up again, so armour and fibre count both want headroom.

Da confermare prima dell'ordine

Fibre count including spare (plan 30–50% above day-one demand), duct or direct burial, and whether rodents are a known problem on the route.

05

Drop — the last span to the subscriber

The highest volume item in any FTTH build and the one your install crews touch most. Strip time per drop, multiplied by thousands of homes, is real money.

Da confermare prima dell'ordine

Aerial or underground, span length, 1 / 2 / 4 core, and whether your crews field-connectorise or splice on site.

06

In-building — riser and floor distribution

Indoors in the EU this is where the fire regulations bite. Getting the class wrong is not a price difference, it is a failed inspection.

Da confermare prima dell'ordine

The CPR Euroclass your project specifies (Eca / Dca / Cca / B2ca) — it changes the sheath compound and therefore the lead time. Tell us at enquiry stage.

Norme e conformità

ISO 9001:2015 ISO 14001 IEC 60794 ITU-T G.652 / G.657 RoHS REACH CPR Eca

Serve un preventivo o una scheda tecnica?

Indicaci modello, quantità e porto di destinazione. La maggior parte delle richieste riceve risposta entro un giorno lavorativo.

Richiedi un preventivo Scrivici